Scope of Work

Summary

New kitchen cabinets and backsplash.

Detailed Scope

Remove and replace all upper and lower kitchen cabinets. Install new tile backsplash from counter to upper cabinets. Countertops to remain (quartz, good condition). Appliances will be disconnected/reconnected by contractor.

Existing Conditions

Oak cathedral/arched raised-panel cabinets with crown molding throughout. Approximately 4-5 upper cabinet boxes on stove wall + 1 corner cabinet above refrigerator. 4-5 base cabinet boxes including 4-drawer bank; peninsula base cabinets house sink and dishwasher. Diagonal diamond-pattern blue/gray tile backsplash with decorative listello border strip โ€” primarily on stove wall. Dark speckled polished granite countertops throughout (staying). Stainless gas range, OTR microwave, black French-door refrigerator, stainless dishwasher and sink all staying. Vaulted ceiling โ€” uppers do NOT go to ceiling, ~3-4ft of open wall space above cabinets. Walk-in pantry under stairs has basic open shelving (not in cabinet scope). Hardwood flooring in kitchen.

Dimensions / Measurements

Kitchen approx 18ft ร— 14ft open to dining

Materials & Supply

Homeowner purchasing cabinets through supplier; contractor to pick up and install. Homeowner supplies backsplash tile. Contractor supplies labor and all installation materials.

Additional Notes

Vaulted ceiling is a key consideration โ€” new upper cabinet height/sizing decisions needed. Countertops (granite) are staying; contractor must protect during demo and install. All appliances staying โ€” contractor disconnects/reconnects. Open floor plan means kitchen is exposed to living room during work. Pantry shelving is NOT in scope unless homeowner adds it. Backsplash scope TBD โ€” confirm if new backsplash extends beyond stove wall to peninsula back-wall and around sink.

๐Ÿ“…
Bid Deadline
March 30, 2026
๐Ÿ—“๏ธ
Preferred Start
June 2026
๐Ÿ“‹
Bids Submitted
0 bids received

Proposed Photos

๐ŸŽจ Proposed photo coming soon
๐ŸŽจ Proposed photo coming soon
๐ŸŽจ Proposed photo coming soon

Current Photos

Before โ€” full kitchen overview from living room Before โ€” full kitchen overview from living room Before โ€” stove wall, upper and lower cabinets, backsplash Before โ€” stove wall, upper and lower cabinets, backsplash Before โ€” peninsula bar side with granite overhang Before โ€” peninsula bar side with granite overhang Before โ€” peninsula kitchen side, dishwasher and refrigerator Before โ€” peninsula kitchen side, dishwasher and refrigerator Walk-in pantry (under stairs) โ€” left wall shelving Walk-in pantry (under stairs) โ€” left wall shelving Walk-in pantry โ€” right/back wall Walk-in pantry โ€” right/back wall Walk-in pantry โ€” far back corner Walk-in pantry โ€” far back corner Walk-in pantry โ€” back shelf detail Walk-in pantry โ€” back shelf detail
Want to see the space first? Schedule a free walkthrough before submitting your bid.
๐Ÿ“… Schedule a Walkthrough

Submit Your Bid

Interested in this project? Fill out the form below to submit your bid. We'll review all submissions and follow up with shortlisted contractors.

$
๐Ÿ 

No updates yet โ€” check back soon.