Interior ยท Contractor

Bonus Room Built-ins

Planning Contractor

Scope of Work

Summary

Custom built-in shelving and cabinets in bonus room media space. Unit substantially built โ€” contractor needed to finish face frames, paint all raw wood white to match existing cabinetry, fill all holes and gaps, add scribe/trim pieces at ceiling angles on both upper corners, caulk all gaps, and remove triangular corner cabinet doors to create open shelving consistent with surrounding cubby spaces.

Detailed Scope

Finish and complete custom built-in shelving/cabinet unit. Scope includes: sand, fill, and paint all raw face frames to match white Shaker cabinetry; add scribe/trim pieces at all ceiling angle transitions; caulk all gaps; optionally seal/finish butcher block countertop; address any structural fit issues. Projector and screen must be protected during work.

Existing Conditions

Built-in unit is substantially constructed. White Shaker cabinet doors/drawers with matte black bar pulls installed. Finger-jointed hardwood butcher block countertop runs full center width. Motorized drop-down projector screen integrated into upper cabinet housing. Epson ceiling-mounted projector in place. Raw pine/poplar face frames throughout open shelving sections โ€” unfinished, nail holes and wood filler visible, need sanding and painting. Visible gaps at ceiling angle transitions need scribe trim or caulk. Vaulted ceiling with ~45ยฐ slopes both sides. Ceiling height ~8.5โ€“9ft at peak, ~4โ€“4.5ft at knee walls. Light gray carpet flooring, good condition. No windows. At least one electrical outlet in left shelf section.

Dimensions / Measurements

Bonus room approx 14โ€“18ft wide. Built-in spans full end wall (knee wall to knee wall). Ceiling peak ~8.5โ€“9ft, slopes to ~4โ€“4.5ft at knee walls, ~45ยฐ pitch both sides.

Materials & Supply

Homeowner supplying all MDF, paint, and hardware. Contractor to supply fasteners and trim.

Additional Notes

Unit was partially DIY-built and needs professional finishing. Face frames are the primary unfinished item. Scribe work at the angled ceiling will require precision cuts. Projector (Epson, ceiling-mounted) must be protected โ€” do not disturb mount or alignment.

๐Ÿ“…
Bid Deadline
March 20, 2026
๐Ÿ—“๏ธ
Preferred Start
April 2026
๐Ÿ“‹
Bids Submitted
0 bids received

Proposed Photos

Proposed finish โ€” face frames painted white, triangular corner sections open, scribe trim at ceiling angles Proposed finish โ€” face frames painted white, triangular corner sections open, scribe trim at ceiling angles

Current Photos

Current state โ€” full built-in wall, projector screen deployed Current state โ€” full built-in wall, projector screen deployed Room overview โ€” full context, ceiling projector visible Room overview โ€” full context, ceiling projector visible Left side detail โ€” base cabinets, drawers, butcher block countertop Left side detail โ€” base cabinets, drawers, butcher block countertop Right column detail โ€” unfinished face frames, ceiling angle Right column detail โ€” unfinished face frames, ceiling angle
Want to see the space first? Schedule a free walkthrough before submitting your bid.
๐Ÿ“… Schedule a Walkthrough

Submit Your Bid

Interested in this project? Fill out the form below to submit your bid. We'll review all submissions and follow up with shortlisted contractors.

$
๐Ÿ 

No updates yet โ€” check back soon.